160621-N-YL257-033 PORTSMOUTH, Va. (June 21, 2016) Hospital Corpsman 1st Class Joseph Bowman mixes plaster for a denture set aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
Date Taken: | 06.21.2016 |
Date Posted: | 06.25.2016 00:12 |
Photo ID: | 2689196 |
VIRIN: | 160621-N-YL257-033 |
Resolution: | 3341x2223 |
Size: | 857.24 KB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 6 |
Downloads: | 14 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 201 of 201], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.