An excavator operated by Bristol Environmental Remediation Services, LLC, digs up contaminated soil and old, rusted diesel drums June 20 during an environmental cleanup project at Attu Island. During the project, the U.S. Army Corps of Engineers-Alaska District oversaw the removal of about 10,000 tons of petroleum, oil and lubricant-contaminated soil; five tons of lead-contaminated soil; 70 tons of tar drums; and 52 above-ground storage tanks.
Date Taken: | 06.22.2016 |
Date Posted: | 08.04.2016 19:46 |
Photo ID: | 2770548 |
VIRIN: | 160622-A-RN349-001 |
Resolution: | 1378x919 |
Size: | 1.35 MB |
Location: | JB ELMENDORF-RICHARDSON, ALASKA, US |
Web Views: | 220 |
Downloads: | 10 |
This work, Corps begins cleanup of Formerly Used Defense Site at Attu Island [Image 11 of 11], by Dena O'Dell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.