160908-N-TS004-030 PORTSMOUTH, Va. (Sept. 8, 2016) Sailors assigned to aircraft carrier USS Harry S. Truman (CVN 75) take the Navy wide E-5 advancement exam. Truman is currently undergoing a Planned Incremental Availability (PIA) at Norfolk Naval Shipyard for maintenance and refurbishment of shipboard systems to prepare for future operations. (U.S. Navy photo by Mass Communication Specialist Seaman Sean Frank/Released)
Date Taken: | 09.08.2016 |
Date Posted: | 09.14.2016 00:09 |
Photo ID: | 2851841 |
VIRIN: | 160908-N-TS004-030 |
Resolution: | 2381x1590 |
Size: | 1.07 MB |
Location: |
Web Views: | 11 |
Downloads: | 18 |
This work, 160908-N-TS004-030 [Image 253 of 253], by Seana E Frank, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.