Soldiers with the 1041st Engineer Company, Wyoming Army National Guard, begin the process of connecting bays of the Improved Ribbon Bridge, or IRB, July 21, at the Guernsey Reservoir, in Wyoming. The Soldiers work under the supervision of civilian instructors from AM General, the bridge’s manufacturer. The IRB replaces the Standard Ribbon Bridge, developed in the 1970s. The bridge, which can be turned into a raft, can carry a heavy equipment transport loaded with an M1A2 Abrams tank. The 1041st is based in armories in the Wyoming cities of Rock Springs, Evanston and Afton.
Date Taken: | 07.21.2010 |
Date Posted: | 07.26.2010 10:45 |
Photo ID: | 303161 |
VIRIN: | 100726-A-0301V-001 |
Resolution: | 3872x2592 |
Size: | 4.51 MB |
Location: | GUERNSEY, WYOMING, US |
Web Views: | 172 |
Downloads: | 9 |
This work, Wyoming Guard Fields New Float Bridge [Image 11 of 11], by MAJ Christian Venhuizen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.