U.S. Army Spc. Jonathan Willbanks, Bravo Company, 4th Combat Aviation Brigade, 4th Infantry Division, prepares an AH-64 Apache as a static display before a ribbon cutting ceremony to officially open the full length of the runway at Shindand Air Base, Afghanistan, Dec. 20, 2010. The runway is now capable of supporting aircraft as large as the C-17 Globemaster III.
Date Taken: | 12.20.2010 |
Date Posted: | 12.20.2010 20:27 |
Photo ID: | 351502 |
VIRIN: | 101220-F-5751H-006 |
Resolution: | 4256x2832 |
Size: | 1.65 MB |
Location: | SHINDAND AIR BASE, AF |
Web Views: | 129 |
Downloads: | 5 |
This work, Shindand Runway Opening [Image 14 of 14], by MSgt Eric Harris, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.