A picnic shelter that was completed as part of a troop project is shown Sept. 20, 2017, on the cantonment area at Fort McCoy, Wis. The shelter was built next to the Mission Installation Contracting Command-McCoy building. Troop projects are a regular part of planned improvements at Fort McCoy each year and are coordinated by the Directorate of Public Works at the installation. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 09.20.2017 |
Date Posted: | 10.04.2017 09:28 |
Photo ID: | 3833834 |
VIRIN: | 170920-A-OK556-6743 |
Resolution: | 5472x3648 |
Size: | 7.76 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 2 |
Downloads: | 3 |
This work, 2017 troop projects improve installation operations; more planned for 2018 [Image 9 of 9], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.