A concrete ramp that was worked on as part of a troop project is shown Sept. 20, 2017, at Integrated Tactical Training Base Freedom on South Post at Fort McCoy, Wis. Troop projects are a regular part of planned improvements at Fort McCoy each year and are coordinated by the Directorate of Public Works at the installation. More troop projects are planned for 2018 at the post. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 09.20.2017 |
Date Posted: | 10.04.2017 09:28 |
Photo ID: | 3833858 |
VIRIN: | 170920-A-OK556-6838 |
Resolution: | 5472x3648 |
Size: | 7.42 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 2 |
Downloads: | 3 |
This work, 2017 troop projects improve installation operations; more planned for 2018 [Image 9 of 9], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.