171016-N-UJ486-110 ATLANTIC OCEAN (Oct. 16, 2017) Hull Technician Fireman Josh Espinoza brazes a pipe in the pipe shop aboard USS Harry S. Truman (CVN 75). Truman is currently underway conducting Tailored Shipboard Test Availability and Final Evaluation Problem (TSTA/FEP) in preparation for future operations. (U.S. Navy photo by Mass Communication Specialist Seaman Rebekah A. Watkins/Released)
Date Taken: | 01.01.2009 |
Date Posted: | 10.19.2017 00:47 |
Photo ID: | 3877453 |
VIRIN: | 171016-N-UJ486-110 |
Resolution: | 2500x1663 |
Size: | 1.97 MB |
Location: | USS HARRY S. TRUMAN (CVN 75), ATLANTIC OCEAN |
Web Views: | 14 |
Downloads: | 9 |
This work, 171016-N-UJ486-110 [Image 223 of 223], by PO2 Rebekah Watkins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.