Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Work continues through the holidays to restore power to Cidra residents [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Work continues through the holidays to restore power to Cidra residents

    SAN JUAN, PUERTO RICO

    12.25.2017

    Photo by Gerald Rogers 

    U.S. Army Corps of Engineers, Los Angeles District

    CIDRA, Puerto Rico (Dec. 5, 2017): The Army Corps of Engineers Task Force Power Restoration continues their mission through the holidays. Corps Quality Assurance Specialist Amy Tillery observes as a contracted crew from Mas-Tec erect transmission lines Christmas morning. Residences and businesses in the area have been without power for over 100 days. Patrick Foreman, a lineman operating an auger pole truck at the construction site, said he was overwhelmed with the people’s kindness. “My whole crew just wants to finish our work here as safely and quickly as possible, so these fine people can return to a normal life.”

    IMAGE INFO

    Date Taken: 12.25.2017
    Date Posted: 12.26.2017 17:33
    Photo ID: 4052045
    VIRIN: 171225-A-HS946-111
    Resolution: 6000x4000
    Size: 5.87 MB
    Location: SAN JUAN, PR

    Web Views: 31
    Downloads: 3

    PUBLIC DOMAIN