U.S. Army Corps of Engineers Quality Assurance Specialist Amy Tillery observes as a contracted crew from Mas-Tec persist with a stubborn pole anchor and guy, while working to straighten a recently placed power pole in Cidra, Puerto Rico on Dec. 25, 2017. The previous pole along with most others in the area had either been broken or toppled by Hurricane Irma and Maria. Residences and businesses in the area have been without power for over 100 days. (U.S. Army Corps of Engineers photo by Gerald Rogers)
Date Taken: | 12.25.2017 |
Date Posted: | 12.26.2017 17:33 |
Photo ID: | 4052054 |
VIRIN: | 171225-A-HS946-113 |
Resolution: | 6000x4000 |
Size: | 6.09 MB |
Location: | SAN JUAN, PR |
Web Views: | 52 |
Downloads: | 4 |
This work, Work continues through the holidays to restore power to Cidra residents [Image 4 of 4], by Gerald Rogers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.