U.S. Airmen from the 355th Civil Engineer Squadron, prepare to install a chiller at Davis-Monthan Air Force Base, Ariz., Jan. 30, 2018. After the 563rd Operational Support Squadron’s previous chiller sustained damage, the HVAC team decided to replace the unit due to its use of obsolete refrigerant. The job consisted of hooking up a temporary chiller, removal of the damaged chiller and then installing a new one. (U.S. Air Force photo by Senior Airman Cheyenne A. Powers)
Date Taken: | 01.30.2018 |
Date Posted: | 02.01.2018 16:16 |
Photo ID: | 4115383 |
VIRIN: | 180130-F-PB513-014 |
Resolution: | 4256x2832 |
Size: | 5.35 MB |
Location: | US |
Web Views: | 21 |
Downloads: | 7 |
This work, HVAC team installs a new chiller [Image 5 of 5], by SrA Cheyenne Powers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.