Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    HVAC team installs a new chiller [Image 2 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    HVAC team installs a new chiller

    UNITED STATES

    01.30.2018

    Photo by Senior Airman Cheyenne Powers 

    355th Wing

    U.S. Air Force Senior Airman Henry Alexander 355th Civil Engineer Squadron heavy equipment operator, directs a crane operator during the positioning of new chiller at Davis-Monthan Air Force Base, Ariz., Jan. 30, 2018. The installation of a new chiller was necessary after the previous one at the 563rd Operational Support Squadron sustained total damage. With the help of the Dirt Boyz, the HVAC team were able to
    install a brand new chiller, ensuring the 563rd OSS never experienced a lapse in mission readiness. (U.S. Air Force photo by Senior Airman Cheyenne A. Powers)

    IMAGE INFO

    Date Taken: 01.30.2018
    Date Posted: 02.01.2018 16:16
    Photo ID: 4115386
    VIRIN: 180130-F-PB513-040
    Resolution: 2832x4256
    Size: 4.92 MB
    Location: US

    Web Views: 27
    Downloads: 6

    PUBLIC DOMAIN