U.S. Air Force Senior Airman Henry Alexander 355th Civil Engineer Squadron heavy equipment operator, directs a crane operator during the positioning of new chiller at Davis-Monthan Air Force Base, Ariz., Jan. 30, 2018. The installation of a new chiller was necessary after the previous one at the 563rd Operational Support Squadron sustained total damage. With the help of the Dirt Boyz, the HVAC team were able to
install a brand new chiller, ensuring the 563rd OSS never experienced a lapse in mission readiness. (U.S. Air Force photo by Senior Airman Cheyenne A. Powers)
Date Taken: | 01.30.2018 |
Date Posted: | 02.01.2018 16:16 |
Photo ID: | 4115386 |
VIRIN: | 180130-F-PB513-040 |
Resolution: | 2832x4256 |
Size: | 4.92 MB |
Location: | US |
Web Views: | 27 |
Downloads: | 6 |
This work, HVAC team installs a new chiller [Image 5 of 5], by SrA Cheyenne Powers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.