A U.S. Air Force HH-60G Pavehawk lays disassembled on a phase dock Jan. 10, 2017, at Kadena Air Base, Japan. During the phase inspection crewchiefs examine every inch of the aircraft to ensure serviceability. (U.S. Air Force photo by Senior Airman Omari Bernard)
Date Taken: | 01.10.2018 |
Date Posted: | 02.09.2018 03:01 |
Photo ID: | 4129826 |
VIRIN: | 180110-F-ZC102-1001 |
Resolution: | 7360x4912 |
Size: | 4.74 MB |
Location: | KADENA AIR BASE, OKINAWA, JP |
Web Views: | 30 |
Downloads: | 12 |
This work, Phasing the Pavehawk: 33rd HMU begins 600-hour phase [Image 13 of 13], by SSgt Omari Bernard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.