U.S. Air Force HH-60 Pavehawk crew chiefs from the 33rd Helicopter Maintenance Unit perform a 600-hour phase inspection Jan. 10, 2017, at Kadena Air Base, Japan. Every time an HH-60G Pavehawk reaches 600 flight hours at Kadena Air Base, it has to be dismantled, inspected and then put back together to keep it in pristine condition. (U.S. Air Force photo by Senior Airman Omari Bernard)
Date Taken: | 01.10.2018 |
Date Posted: | 02.09.2018 03:02 |
Photo ID: | 4129847 |
VIRIN: | 180110-F-ZC102-1010 |
Resolution: | 4912x7360 |
Size: | 4.31 MB |
Location: | KADENA AIR BASE, OKINAWA, JP |
Web Views: | 26 |
Downloads: | 12 |
This work, Phasing the Pavehawk: 33rd HMU begins 600-hour phase [Image 13 of 13], by SSgt Omari Bernard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.