Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Task Force Power Restoration stabilizes regional transmission system [Image 7 of 22]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Task Force Power Restoration stabilizes regional transmission system

    U.S. Army Corps of Engineers Task Force Power Restoration contractors complete work on a transmission line in the Guanica State Forest, Puerto Rico, April 6. The line connects the Costa Sur Power Plant in Ponce to Mayaguez. Mayaguez is the eighth-largest municipality in Puerto Rico. The repairs stabilized the system for the region.

    IMAGE INFO

    Date Taken: 04.06.2018
    Date Posted: 04.07.2018 12:35
    Photo ID: 4277379
    VIRIN: 180406-A-IE537-042
    Resolution: 5472x3648
    Size: 5.07 MB
    Location: PR

    Web Views: 30
    Downloads: 9

    PUBLIC DOMAIN