U.S. Army Corps of Engineers Task Force Power Restoration contractors complete work on a transmission line in the Guanica State Forest, Puerto Rico, April 6. The line connects the Costa Sur Power Plant in Ponce to Mayaguez. Mayaguez is the eighth-largest municipality in Puerto Rico. The repairs stabilized the system for the region.
Date Taken: | 04.06.2018 |
Date Posted: | 04.07.2018 12:35 |
Photo ID: | 4277392 |
VIRIN: | 180406-A-IE537-102 |
Resolution: | 5472x3648 |
Size: | 5.25 MB |
Location: | PR |
Web Views: | 32 |
Downloads: | 11 |
This work, Task Force Power Restoration stabilizes regional transmission system [Image 22 of 22], by Dave Palmer, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.