180625-N-SO730-0151 ATLANTIC OCEAN (June 25, 2018) Sailors relocate equipment to make room for aircraft in the hangar bay aboard the aircraft carrier USS George H.W. Bush (CVN 77). The ship is underway conducting routine training exercises to maintain carrier readiness. (U.S. Navy photo by Mass Communication Specialist 3rd Class Joe Boggio)
Date Taken: | 06.25.2018 |
Date Posted: | 06.27.2018 15:41 |
Photo ID: | 4517651 |
VIRIN: | 180625-N-SO730-0151 |
Resolution: | 3903x2596 |
Size: | 1.3 MB |
Location: | ATLANTIC OCEAN |
Web Views: | 35 |
Downloads: | 10 |
This work, GHWB Hangar Bay Work [Image 15 of 15], by PO3 Joseph C Boggio, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.