Spc. Suzette Blaser, 389th Engineer Company, measures out a wall panel during the renovation of a division operation center on Contingency Operating Base Adder, Sept. 8, 2011.
Date Taken: | 09.08.2011 |
Date Posted: | 09.16.2011 07:20 |
Photo ID: | 457571 |
VIRIN: | 110908-A-IX584-128 |
Resolution: | 2292x3368 |
Size: | 349.88 KB |
Location: | CONTINGENCY OPERATING BASE ADDER, IQ |
Web Views: | 30 |
Downloads: | 0 |
This work, New operations center under construction [Image 5 of 5], by SPC Anthony Zane, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.