The St. Paul District, along with the Minnesota Department of Natural Resources and the Upper Minnesota River Watershed District, oversaw the rerouting of the Pomme de Terre River, near Ortonville, Minnesota, on Oct. 1. Immediately following removal of the embankment, staff from Corps of Engineers and Minnesota DNR began relocating mussels impacted by the river restoration. (Photo by: Anthony Feilzer)
Date Taken: | 10.01.2018 |
Date Posted: | 10.05.2018 11:13 |
Photo ID: | 4798737 |
VIRIN: | 181001-A-CE999-213 |
Resolution: | 3328x2392 |
Size: | 4.92 MB |
Location: | MINNESOTA, US |
Web Views: | 22 |
Downloads: | 5 |
This work, A river rerouted: Step 1 in the Marsh Lake ecosystem restoration project [Image 9 of 9], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.