Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    A river rerouted: Step 1 in the Marsh Lake ecosystem restoration project [Image 7 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A river rerouted: Step 1 in the Marsh Lake ecosystem restoration project

    MINNESOTA, UNITED STATES

    10.01.2018

    Photo by Emily M Chavolla 

    U.S. Army Corps of Engineers, St. Paul District

    The St. Paul District, along with the Minnesota Department of Natural Resources and the Upper Minnesota Watershed District, oversaw the rerouting of the Pomme de Terre River, near Ortonville, Minnesota, on Oct. 1. The river restoration is one of three project features as part of the Marsh Lake Ecosystem Restoration Project, which aims to improve habitat in the area. The other two features include a water control drawdown structure (currently under construction) and fish passage (coming soon). (Photo by: Emily Chavolla)

    IMAGE INFO

    Date Taken: 10.01.2018
    Date Posted: 10.05.2018 11:13
    Photo ID: 4798744
    VIRIN: 181001-A-RL420-025
    Resolution: 4032x3024
    Size: 8 MB
    Location: MINNESOTA, US

    Web Views: 26
    Downloads: 6

    PUBLIC DOMAIN