Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo District's Temporary Crane Barge Completes Load Test in Ashtabula Harbor [Image 11 of 13]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Buffalo District's Temporary Crane Barge Completes Load Test in Ashtabula Harbor

    ASHTABULA, OHIO, UNITED STATES

    10.16.2018

    Photo by Shaina Souder 

    U.S. Army Corps of Engineers, Buffalo District

    The U.S. Army Corps of Engineers, Buffalo District conducted a load test for a crane that was recently installed on the former McCauley in Ashtabula Harbor, Ohio, October 16, 2018.
    The load test will establish if the barge crane is safe to operate in water, which will allow for the continuation of critical federal infrastructure maintenance in the Great Lakes by the Buffalo District floating plant crew.

    IMAGE INFO

    Date Taken: 10.16.2018
    Date Posted: 10.25.2018 15:10
    Photo ID: 4845590
    VIRIN: 181016-A-YS819-034
    Resolution: 4686x3194
    Size: 3.21 MB
    Location: ASHTABULA, OHIO, US

    Web Views: 7
    Downloads: 3

    PUBLIC DOMAIN