181209-N-LM768-6258
BATH, Maine (Dec. 9, 2018) Following a multi-day process that includes moving the ship from the land level facility to the dry dock, the future USS Lyndon B. Johnson (DDG 1002) is made ready before flooding of the dry dock at General Dynamic-Bath Iron Works shipyard, and subsequent launching of the third Zumwalt-class destroyer. (U.S. Navy photo courtesy of General Dynamics-Bath Iron Works/Released)
Date Taken: | 12.09.2018 |
Date Posted: | 12.12.2018 00:28 |
Photo ID: | 4966661 |
VIRIN: | 181209-N-LM768-6258 |
Resolution: | 6000x4000 |
Size: | 7.33 MB |
Location: |
Web Views: | 229 |
Downloads: | 60 |
This work, 181209-N-LM768-6258 [Image 12 of 12], by Kristin S Mason, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.