The U.S. Army Corps of Engineers and the National Geospatial-Intelligence Agency (NGA) reveal concept renderings for the Next NGA West (N2W) campus from the design-build team McCarthy HITT winning proposal. The entirety of the campus is anticipated to be operational in 2025.
Date Taken: | 04.09.2019 |
Date Posted: | 04.09.2019 15:34 |
Photo ID: | 5251059 |
VIRIN: | 190409-A-YB451-0002 |
Resolution: | 2848x1791 |
Size: | 3.38 MB |
Location: | ST. LOUIS, MISSOURI, US |
Web Views: | 104 |
Downloads: | 6 |
This work, Lobby Concept Rendering of Next NGA West [Image 3 of 3], by James Lowe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.