The U.S. Army Corps of Engineers and the National Geospatial-Intelligence Agency (NGA) reveal concept renderings for the Next NGA West (N2W) campus from the design-build team McCarthy HITT winning proposal. The entirety of the campus is anticipated to be operational in 2025.
Date Taken: | 04.09.2019 |
Date Posted: | 04.09.2019 15:34 |
Photo ID: | 5251062 |
VIRIN: | 190409-A-YB451-0003 |
Resolution: | 5250x2891 |
Size: | 4.13 MB |
Location: | ST. LOUIS, MISSOURI, US |
Web Views: | 130 |
Downloads: | 11 |
This work, Main Entry Concept Rendering of Next NGA West [Image 3 of 3], by James Lowe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.