Construction continues on the NNSA Albuquerque Complex building, March 21, 2019.
Date Taken: | 03.21.2019 |
Date Posted: | 05.24.2019 17:29 |
Photo ID: | 5397544 |
VIRIN: | 190321-A-CZ991-002 |
Resolution: | 4928x3264 |
Size: | 6.8 MB |
Location: | ALBUQUERQUE, NEW MEXICO, US |
Web Views: | 20 |
Downloads: | 2 |
This work, USACE Chief of Engineering and Construction visits Albuquerque District [Image 3 of 3], by Elizabeth Lockyear, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.