Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mosul Dam Project [Image 5 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Mosul Dam Project

    Nathan Braithwaite, a project engineer with the Army Corps of Engineers for the Mosul Dam Task Force, checks a data logger used to collect and store piezometer data, which measures the pressure of groundwater at a specific point, in Mosul, Iraq, May 12, 2019. The Mosul Dam Project started in 2016 headed by the Iraq Ministry of Water Resources in an effort to stabilize the infrastructure of the Mosul dam. The dam serves to generate hydroelectricity and provide water for downstream irrigation. (U.S. Army Reserve photo by Staff Sgt. Joshua Hammock)

    IMAGE INFO

    Date Taken: 05.12.2019
    Date Posted: 05.26.2019 06:32
    Photo ID: 5399141
    VIRIN: 190512-A-BE458-1074
    Resolution: 5968x3979
    Size: 23.53 MB
    Location: MOSUL, IQ

    Web Views: 48
    Downloads: 5

    PUBLIC DOMAIN