Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The Mosul Dam Project [Image 7 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The Mosul Dam Project

    U.S. Army Capt. William Megon, Mosul Dam Task Force logistics officer, explains the use of a grout reel in Mosul, Iraq, May 12, 2019. The grout reel is used in the emergency drilling and grouting operations within the grouting gallery. The Mosul Dam Project started in 2016 headed by the Iraq Ministry of Water Resources in an effort to stabilize the infrastructure of the Mosul dam. The dam serves to generate hydroelectricity and provide water for downstream irrigation. (U.S. Army Reserve photo by Staff Sgt. Joshua Hammock)

    IMAGE INFO

    Date Taken: 05.12.2019
    Date Posted: 05.26.2019 06:34
    Photo ID: 5399144
    VIRIN: 190512-A-BE458-1078
    Resolution: 6720x4480
    Size: 30.58 MB
    Location: MOSUL, IQ

    Web Views: 58
    Downloads: 11

    PUBLIC DOMAIN