U.S. Army Lt. Gen. Gary Volesky, I Corps commanding general, recognizes Cpl. Lucas Hanks, 557th Engineer Construction Company, 555th Engineer Brigade, for his work on the new live-fire trench and bunker complex during a ribbon cutting ceremony at Joint Base Lewis-McChord, May 29, 2019. Construction of the battalion level live-fire training site took over eight months, with engineers working through one of Washington's coldest winters on record to create the Army's largest trench training complex. (U.S. Army photo by Spc. John Weaver)
Date Taken: | 05.28.2019 |
Date Posted: | 06.06.2019 09:13 |
Photo ID: | 5434621 |
VIRIN: | 190528-A-EF393-1213 |
Resolution: | 4564x3413 |
Size: | 1.3 MB |
Location: | WASHINGTON, US |
Web Views: | 42 |
Downloads: | 1 |
This work, Trench and Bunker Complex Ribbon Cutting [Image 12 of 12], by SGT John Weaver, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.