An Iraqi Ministry of Water Resources employee sets a PVC liner in place on the crest of Mosul Dam, in Mosul, Iraq, June 15, 2019. The PVC protects the clay core of the dam. The Mosul Dam Project started in 2016 headed by the Iraq Ministry of Water Resources, in an effort to stabilize the infrastructure of the Mosul dam. The dam supplies water, hydroelectric power, irrigation and flood control to the region. (U.S. Army photo by Spc. Kahlil Dash)
Date Taken: | 06.15.2019 |
Date Posted: | 06.24.2019 03:05 |
Photo ID: | 5519947 |
VIRIN: | 190615-A-DT205-1252 |
Resolution: | 1000x667 |
Size: | 516.4 KB |
Location: | IQ |
Web Views: | 20 |
Downloads: | 8 |
This work, Mosul Dam Project [Image 12 of 12], by SPC Kahlil Dash, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.