(Left) Steven Smith, vice president, Energy Systems Group; presents Alicia Florez, Engineering Manager, Production Plant Barstow, Marine Depot Maintenance Command; with a plaque thanking her for her part in getting the ten acre solar photovoltaic installation about the Yermo Annex up and going. The solar farm was officially opened when Col. Craig Clemans, commanding officer, Marine Corps Logistics Base Barstow, Calif., cut the ribbon on the project Oct. 22. The new solar project is expected to save the base $26,000,000 over the 22 year life of the contract with ESG.
Date Taken: | 10.22.2019 |
Date Posted: | 10.25.2019 13:23 |
Photo ID: | 5860996 |
VIRIN: | 191022-M-TR039-2536 |
Resolution: | 5760x3840 |
Size: | 6.81 MB |
Location: | MARINE CORPS LOGISTICS BASE BARSTOW, CALIFORNIA, US |
Web Views: | 22 |
Downloads: | 3 |
This work, Harvesting the power of the sun aboard MCLB Barstow [Image 4 of 4], by Keith Hayes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.