Rains and warm weather led Corps officials to begin diverting flows from Mill Creek into Bennington Lake Thursday, Feb. 6. To reduce damages and prevent debris from blocking the river channel, crews used heavy equipment to remove debris from the river channel as conditions allowed.
Date Taken: | 02.07.2020 |
Date Posted: | 02.12.2020 17:38 |
Photo ID: | 6093620 |
VIRIN: | 200207-A-LQ420-0822 |
Resolution: | 5568x3712 |
Size: | 2.61 MB |
Location: | WALLA WALLA, WASHINGTON, US |
Web Views: | 39 |
Downloads: | 1 |
This work, An excavator removes debris from the Mill Creek Channel [Image 6 of 6], by Eileen Williamson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.