Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Reinstalling the Black Rock Lock miter gates [Image 32 of 34]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Reinstalling the Black Rock Lock miter gates

    The U.S. Army Corps of Engineers Regional Rivers Repair Fleet reinstalls the Black Rock Lock west miter gate in Buffalo, NY, April 8, 2020. The crew is positioning the gate before connecting it to the Lock wall.

    Buffalo District, Huntington District, and Regional Rivers Repair Fleet (R3F) personnel from fleets moored in Pittsburgh, Nashville and Louisville are working to improve the Black Rock Lock infrastructure and sustain its functionality for future navigation seasons.

    IMAGE INFO

    Date Taken: 04.08.2020
    Date Posted: 04.10.2020 14:27
    Photo ID: 6169385
    VIRIN: 200408-A-PG036-033
    Resolution: 6016x4016
    Size: 11.89 MB
    Location: US

    Web Views: 27
    Downloads: 2

    PUBLIC DOMAIN