Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dam safety remains top priority admist COVID-19 challenges [Image 2 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Dam safety remains top priority admist COVID-19 challenges

    NEBRASKA, UNITED STATES

    05.12.2020

    Photo by Nyime Gilchrist 

    U.S. Army Corps of Engineers, Omaha District

    Narturi Narciso, engineer in training, U.S. Army Corps of Engineers, Omaha District,enters a conduit at a conduit to inspect the drainage system at Salt Creek Site 2, Olive Creek Dam, Neb., to check for erosion and if the outlet channel in satisfactory condition May 1.
    This was the first inspection the dam safety program conducted since the COVID-19 pandemic began.

    IMAGE INFO

    Date Taken: 05.12.2020
    Date Posted: 05.15.2020 16:43
    Photo ID: 6206402
    VIRIN: 200512-A-UX239-383
    Resolution: 3023x2454
    Size: 3.35 MB
    Location: NEBRASKA, US

    Web Views: 8
    Downloads: 2

    PUBLIC DOMAIN