Narturi Narciso, engineer in training, U.S. Army Corps of Engineers, Omaha District, exits a conduit at Salt Creek Site 2, Olive Creek Dam, Neb., after conducting a structural inspection May 1. Kristle Beaudet, dam safety manager, assists with the equipment and documentation. This was the first inspection the dam safety program conducted since the COVID-19 pandemic began.
Date Taken: | 05.12.2020 |
Date Posted: | 05.15.2020 16:40 |
Photo ID: | 6206403 |
VIRIN: | 200512-A-UX239-084 |
Resolution: | 3024x2629 |
Size: | 2.04 MB |
Location: | NEBRASKA, US |
Web Views: | 13 |
Downloads: | 2 |
This work, Dam safety remains top priority admist COVID-19 challenges [Image 3 of 3], by Nyime Gilchrist, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.