Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dam safety remains top priority admist COVID-19 challenges [Image 3 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Dam safety remains top priority admist COVID-19 challenges

    NEBRASKA, UNITED STATES

    05.12.2020

    Photo by Nyime Gilchrist 

    U.S. Army Corps of Engineers, Omaha District

    Narturi Narciso, engineer in training, U.S. Army Corps of Engineers, Omaha District, exits a conduit at Salt Creek Site 2, Olive Creek Dam, Neb., after conducting a structural inspection May 1. Kristle Beaudet, dam safety manager, assists with the equipment and documentation. This was the first inspection the dam safety program conducted since the COVID-19 pandemic began.

    IMAGE INFO

    Date Taken: 05.12.2020
    Date Posted: 05.15.2020 16:40
    Photo ID: 6206403
    VIRIN: 200512-A-UX239-084
    Resolution: 3024x2629
    Size: 2.04 MB
    Location: NEBRASKA, US

    Web Views: 13
    Downloads: 2

    PUBLIC DOMAIN