Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    C-17 Globemaster III engine change [Image 3 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    C-17 Globemaster III engine change

    (UNDISCLOSED LOCATION)

    08.04.2012

    Photo by Staff Sgt. Sheila deVera and Staff Sgt. Sheila deVera

    379th Air Expeditionary Wing

    U.S. Air Force Staff Sgt. Aaron Bingham, 8th Expeditionary Air Mobility Squadron aerospace propulsion craftsman, checks the technical data before attaching the engine removal/installation cradle to the C-17 Globemaster III engine three in Southwest Asia, August 4, 2012. Most engine changes are done within 48 hours in a controlled environment inside an aircraft hangar, but the ‘Ocho’ team finished in 34 hours and saved $120,000 by doing the repairs downrange at the 379th Air Expeditionary Wing. Bingham is deployed from Joint Base Lewis-McChord, Wash.

    IMAGE INFO

    Date Taken: 08.04.2012
    Date Posted: 08.09.2012 05:14
    Photo ID: 641933
    VIRIN: 120804-F-XA488-055
    Resolution: 4256x2832
    Size: 1.35 MB
    Location: (UNDISCLOSED LOCATION)
    Hometown: OAK HARBOR, WASHINGTON, US

    Web Views: 70
    Downloads: 6

    PUBLIC DOMAIN