U.S. Army Corps of Engineers Buffalo District contractor Ryba Marine Construction Co. dredges the Buffalo Harbor, Buffalo, NY, September 23, 2020. All dredging will be performed within the federal navigation channel. Standard O&M dredging will be performed between the river mouth and station 132+00 (about one mile upstream of the Ohio Street bridge). An additional area will be dredged upstream of the South Park bridge, which will have the added benefit of alleviating ice jams in the area. Strategic navigation dredging will target residual contamination in five specific areas throughout the river.
Date Taken: | 09.23.2020 |
Date Posted: | 11.19.2020 13:49 |
Photo ID: | 6427855 |
VIRIN: | 200923-A-PG036-023 |
Resolution: | 6016x4016 |
Size: | 13.75 MB |
Location: | US |
Web Views: | 6 |
Downloads: | 2 |
This work, Buffalo River dredging, Fall 2020 [Image 11 of 11], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.