“The confined disposal facility we’re using behind me is the Toledo Port Authority’s. In each cell there’s space for 10,000,000 cubic yards of material, which should last for 13 or 14 years. The Buffalo District owns another CDF here, but we have no need to use it right now. Our facility is used for material that doesn’t meet Clean Water Act requirements and all of our material from the shipping channel in Toledo meets CWA requirements.” - USACE Buffalo construction representative Mark Schwab
Date Taken: | 11.04.2020 |
Date Posted: | 12.18.2020 15:26 |
Photo ID: | 6462252 |
VIRIN: | 201104-A-PG036-017 |
Resolution: | 5747x3872 |
Size: | 9.02 MB |
Location: | US |
Web Views: | 11 |
Downloads: | 6 |
This work, Toledo Harbor/Maumee River dredging - Fall 2020 [Image 29 of 29], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.