NAVAL STATION ROTA, Spain (Oct. 15, 2020) – Lt. Chanhan Lee, construction manager of Public Works Department Rota, Nolly Dizon, food service officer of NAVSTA Rota Galley, and Mario Leandro, quality control manager of UTE Castellano-Cobra, conduct a walkthrough of the construction site of the Galley Utilities Replacement project (N33191-15-D-0826 TO N33191-18-F-4498). The purpose of this $4 million project is to replace and upgrade the existing plumbing, sewer, electrical, fire protection/alarm system, and kitchen ventilation systems at the NAVSTA Rota Galley, Building 38. (U.S. Navy photo by Lt. Chanhan Lee)
Date Taken: | 03.02.2021 |
Date Posted: | 03.08.2021 09:52 |
Photo ID: | 6546701 |
VIRIN: | 210302-N-HB733-0046 |
Resolution: | 900x1600 |
Size: | 167.92 KB |
Location: | ROTA, ES |
Web Views: | 58 |
Downloads: | 2 |
This work, Public Works Rota Hosts First Industry Day [Image 15 of 15], by PO1 Brianna Green, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.