(From left to right) Kane Johnson, the assistant training and safety chief, Craig Crytzer and Tommy Saenger, firefighters with Cherry Point Fire and Emergency Services, observe the construction site of the new training tower Aug. 24. The tower is an improvement from the old two-story facility because new building has four stories and added obstacles.
Date Taken: | 08.24.2012 |
Date Posted: | 09.06.2012 08:56 |
Photo ID: | 658765 |
VIRIN: | 120824-M-FL266-010 |
Resolution: | 4080x2720 |
Size: | 7.82 MB |
Location: | MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA, US |
Web Views: | 71 |
Downloads: | 2 |
This work, Cherry Point Fire Department builds four-story training tower [Image 4 of 4], by LCpl Glen Santy, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.