FORT MCCLELLAN, Ala. – A reflection seen in a latrine mirror shows the inside of the aging WWII barrack. The barracks that stand in this area have aged beyond repair and are scheduled to be demolished and replaced with updated facilities that meet all local, state, and federal building codes. (Photo by U.S. Army Sgt. Jaccob Hearn)
Date Taken: | 04.09.2021 |
Date Posted: | 05.02.2021 14:50 |
Photo ID: | 6626211 |
VIRIN: | 210409-A-AB787-322 |
Resolution: | 6720x4480 |
Size: | 16.08 MB |
Location: | ANNISTON, ALABAMA, US |
Web Views: | 279 |
Downloads: | 5 |
This work, Ft. McClellan begins site improvement project [Image 4 of 4], by SSG Jaccob Hearn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.