Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Helicopter facelift: Pittsburgh District replaces control tower hoist [Image 9 of 13]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Helicopter facelift: Pittsburgh District replaces control tower hoist

    WILCOX, PENNSYLVANIA, UNITED STATES

    06.14.2021

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Engineers with the U.S. Army Corps of Engineers Pittsburgh District talk with contractors before performing a helicopter lift to remove a hoist from inside the control tower at the East Branch Clarion River Lake in Wilcox, Pennsylvania, June 14, 2021. The control tower is original to the dam, which was completed in 1952. East Branch Dam has prevented flood damages estimated to be more than $98 million, equivalent to $456 million in today’s dollars. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

    IMAGE INFO

    Date Taken: 06.14.2021
    Date Posted: 06.24.2021 15:39
    Photo ID: 6707471
    VIRIN: 210614-A-TI382-183
    Resolution: 6048x4024
    Size: 5.23 MB
    Location: WILCOX, PENNSYLVANIA, US

    Web Views: 11
    Downloads: 6

    PUBLIC DOMAIN