Engineers with the U.S. Army Corps of Engineers Pittsburgh District talk with contractors before performing a helicopter lift to remove a hoist from inside the control tower at the East Branch Clarion River Lake in Wilcox, Pennsylvania, June 14, 2021. The control tower is original to the dam, which was completed in 1952. East Branch Dam has prevented flood damages estimated to be more than $98 million, equivalent to $456 million in today’s dollars. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)
Date Taken: | 06.14.2021 |
Date Posted: | 06.24.2021 15:39 |
Photo ID: | 6707471 |
VIRIN: | 210614-A-TI382-183 |
Resolution: | 6048x4024 |
Size: | 5.23 MB |
Location: | WILCOX, PENNSYLVANIA, US |
Web Views: | 11 |
Downloads: | 6 |
This work, Helicopter facelift: Pittsburgh District replaces control tower hoist [Image 13 of 13], by Michel Sauret, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.