A U.S. Army Corps of Engineers South Pacific Border District contractor removes debris from maintenance road at the Tucson 9 former wall construction site near Sierra Vista, Arizona, August 19. The District began safety work in early August at the Tucson 9 and Tucson 3 former wall construction sites in the U.S. Border Patrol’s Tucson sector. This work will not involve expanding the border barrier and specific activities will include filling open trenches, cutting and capping conduit, making gate foundations safe, making maintenance roads safe, and grading around handholds and manholes. (No one in this photo crossed the international border.)
Date Taken: | 08.19.2021 |
Date Posted: | 09.13.2021 11:02 |
Photo ID: | 6815313 |
VIRIN: | 210819-A-CM245-0053 |
Resolution: | 1800x1200 |
Size: | 1.97 MB |
Location: | SIERRA VISTA, ARIZONA, US |
Web Views: | 26 |
Downloads: | 3 |
This work, Tucson 9 Make Safe work [Image 13 of 13], by Orville Collins, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.