Custom Plexiglass panes built by the Mat Sinking Unit’s (MSU) carpentry shop divide tables in the galley as a COVID-19 safety measure on Sept. 14, 2021 while the floating plant prepares to depart Vicksburg, Mississippi for its revetment mission on the Mississippi River. This was part of the enhanced COVID-19 protocol designed to ensure crew health. The MSU briefly paused revetment operations to implement enhanced COVID-19 safety precautions to help ensure the health of the nearly 300 crewmembers before continuing the mission. (USACE photo by Bucky Wall)
Date Taken: | 09.14.2021 |
Date Posted: | 09.16.2021 12:49 |
Photo ID: | 6838723 |
VIRIN: | 210914-D-BM664-001 |
Resolution: | 3888x2592 |
Size: | 1.51 MB |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 104 |
Downloads: | 2 |
This work, USACE Vicksburg District Mat Sinking Unit forges ahead with revetment mission [Image 8 of 8], by Bucky Wall, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.