Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New aircraft hangar begins to take shape [Image 3 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New aircraft hangar begins to take shape

    DOVER AIR FORCE BASE, DELAWARE, UNITED STATES

    10.08.2021

    Photo by Roland Balik      

    436th Airlift Wing

    Two cranes simultaneously raise a 70,000-pound truss during the construction of the new aircraft maintenance hangar at Dover Air Force Base, Delaware, Oct. 8, 2021. The critical lift of the 263-foot-long truss is the first of nine trusses to be installed during the construction process. Once completed, the 84,147 square foot, single bay hangar will be able to fully enclose both C-5 and C-17 aircraft for maintenance. The U.S. Army Corps of Engineers is overseeing the $41.2 million project. (U.S. Air Force photo by Roland Balik)

    IMAGE INFO

    Date Taken: 10.08.2021
    Date Posted: 10.14.2021 10:52
    Photo ID: 6886075
    VIRIN: 211008-F-BO262-1004
    Resolution: 4928x3280
    Size: 3.09 MB
    Location: DOVER AIR FORCE BASE, DELAWARE, US

    Web Views: 33
    Downloads: 5

    PUBLIC DOMAIN