Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineering and Installation team tackles communication lines [Image 7 of 13]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineering and Installation team tackles communication lines

    ALI AL SALEM AIR BASE, KUWAIT

    10.19.2021

    Photo by Tech. Sgt. Daryn Murphy 

    386th Air Expeditionary Wing

    A member of the U.S. Air Forces Central, Air Force Forces A67 Engineering and Installation team clears out a communications maintenance hole at Ali Al Salem Air Base, Kuwait, on Oct. 19, 2021. The A67 E&I team is entrusted to install and engineer new communications system for different mission requirements, as well as relocate and remove old or obsolete systems to improve the installation. (U.S. Air Force Photo by Tech. Sgt. Daryn Murphy)

    IMAGE INFO

    Date Taken: 10.19.2021
    Date Posted: 10.20.2021 07:57
    Photo ID: 6896065
    VIRIN: 211019-F-RW874-1015
    Resolution: 6048x4024
    Size: 12.2 MB
    Location: ALI AL SALEM AIR BASE, KW

    Web Views: 13
    Downloads: 5

    PUBLIC DOMAIN