A member of the U.S. Air Forces Central, Air Force Forces A67 Engineering and Installation team removes dirt around the entrance to a communications maintenance hole at Ali Al Salem Air Base, Kuwait, on Oct. 19, 2021. The A67 E&I team is entrusted to install and engineer new communications system for different mission requirements, as well as relocate and remove old or obsolete systems to improve the installation. (U.S. Air Force Photo by Tech. Sgt. Daryn Murphy)
Date Taken: | 10.19.2021 |
Date Posted: | 10.20.2021 07:57 |
Photo ID: | 6896069 |
VIRIN: | 211019-F-RW874-1030 |
Resolution: | 6048x4024 |
Size: | 10.75 MB |
Location: | ALI AL SALEM AIR BASE, KW |
Web Views: | 16 |
Downloads: | 4 |
This work, Engineering and Installation team tackles communication lines [Image 13 of 13], by TSgt Daryn Murphy, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.