An abandoned Arundo donax hut partially hidden on the wooded bank is revealed as contracted workers removed tons of trash from San Jose Creek. Arundo is an invasive giant reed that grows very fast. The U.S. Army Corps of Engineers Los Angeles District cleared 575 tons of debris from about 120 acres of riverbank, Sept. 27-Oct. 22, 2021.
Date Taken: | 09.27.2021 |
Date Posted: | 10.26.2021 19:53 |
Photo ID: | 6907008 |
VIRIN: | 210927-A-ED169-1002 |
Resolution: | 4288x2848 |
Size: | 1.96 MB |
Location: | LOS ANGLEES, CALIFORNIA, US |
Web Views: | 45 |
Downloads: | 3 |
This work, Corps river and creek cleanup project removes 575 tons of debris [Image 13 of 13], by William John Reese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.