Birds and other wildlife depend on the San Gabriel River and San Jose Creek for nesting. These feathered friends stand on a cement fall in a section of the river between levees. The U.S. Army Corps of Engineers Los Angeles District cleared about 120 acres of riverbank, Sept. 27-Oct. 22, 2021, in a massive cleanup project.
Date Taken: | 09.27.2021 |
Date Posted: | 10.26.2021 19:53 |
Photo ID: | 6907019 |
VIRIN: | 210927-A-ED169-1009 |
Resolution: | 4288x2848 |
Size: | 1.8 MB |
Location: | LOS ANGELES, CALIFORNIA, US |
Web Views: | 30 |
Downloads: | 3 |
This work, Corps river and creek cleanup project removes 575 tons of debris [Image 13 of 13], by William John Reese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.