The interior of the Mainside Pool lays ready for visitors at Marine Corps Air Station Cherry Point, North Carolina, Nov. 3, 2021. The Mainside Pool had its grand reopening on Oct. 4, 2021, after being closed due to damage caused by Hurricane Florence in 2018. Beginning early 2022, the pool will offer swimming lessons and allow it to be utilized for unit physical training. (U.S. Marine Corps photo by Sgt. Christian J. Lopez)
Date Taken: | 11.03.2021 |
Date Posted: | 11.10.2021 06:46 |
Photo ID: | 6929255 |
VIRIN: | 211103-M-YY148-0049 |
Resolution: | 5760x3840 |
Size: | 2.98 MB |
Location: | MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA, US |
Web Views: | 113 |
Downloads: | 2 |
This work, Mainside Pool Reopening [Image 5 of 5], by Sgt Christian Lopez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.