Walla Walla District Corps of Engineers completes environmental sustainability project. Kelli Zak, Tech Lead and Corps of Engineer conduct a final walkthrough
inspection on Dec. 15, 2021.
Date Taken: | 12.15.2021 |
Date Posted: | 01.18.2022 16:53 |
Photo ID: | 7014478 |
VIRIN: | 211215-A-LQ420-0275 |
Resolution: | 6016x4016 |
Size: | 12.95 MB |
Location: | WALLA WALLA, WASHINGTON, US |
Hometown: | WALLA WALLA, WASHINGTON, US |
Web Views: | 21 |
Downloads: | 3 |
This work, Walla Walla District Corps of Engineers completes environmental sustainability project [Image 20 of 20], by Noe Gonzalez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.